Defect Management:
------------------
A Process which need to be followed after Defect is Identified.
i.e Attributes of Defect,flow of Defect,Tool to use, Status of
Defect.
Severity Priority
1.Impact of Defect from 1.Impact of Defect from
functionality P.O.V Business/CLient P.O.V.
2.Decided by Quality Engineer 2.Decided by Dev/CLient/Business
Category person
3.Level 3.Level
High High(Immediately,Urgent)
Defect in Basic/Critical Func.
Show stopper
Abnormal Termination
Medium Medium(Before Release)
Functional Defect but
Less Important
Low Low(Can be fixed in next Version)
Font ,Color ,Size
H.S & H.P.
H.S & L.p.
L.S & H.P.
L.S & L.P.
----------------------------------------------------------------------
Defect Flow:
-------------
1.Tester > TTL > DTL > DEV > Tester (Mostly in MNC)
2.Tester > DTL/TTL > DEV > Tester (Middle Scale Company )
3.Tester > DEV > Tester (Low Scale Company)
Defect Life Cycle:
-------------------
Test Planning :
---------------
A Process of Describing Strategy/ Approach of Testing is Called
As Test Planning & Test Plan Document is Produced
Why to do Test Planning ?
--------------------------
1.Better Management
2.Full utilization of Resources
3.Risk Management
4.to do effective Testing( Testing with Good Outcome)
When To Start Test Planing:
---------------------------
1.Requirement Document should be base line
2.Development Plan should be Baseline
IEEE 829 :
1.Test Plan ID:
LMS_MTP_01 > MTP:Master Test Plan | STP:System Test Plan
A Company Level Unique ID for Test PLan
2.References :
1.SRS/BRS
2.Development Plan
3.Previous version of Same Product(optional)
4.Similar Project(optional)
5.IEEE Research Paper (optional)
3.Introduction:
4-5 lines about your Project
4.Feature to be Tested :(What to test ?)
Admin:
> Add/Edit /Delete Books
> Add/Edit /Delete User
> Fine Calculate
> Search for Books/User
> Manage Profile
Librarian:
> Add/Edit /Delete Students
> Issue Book
> Return Book
> Fine Collection
> Search for Book
> Manage Profile
Student:
> Issue Book
> Return Book
> Pay Fine
> Search Book
> Request for Book
----------------------------------------------------------------------
5.Feature Not to be Test ed:(What not to Test : Out of the Scope)
1.Online Fine Payment( Will be Devlop in Next Version )
6.Test Items:
Listing all Modules
1.Admin
2.Librarian
3.Students
7.Test Environment/ Test Bed/ Test Lab:
Hardware & Software Configuration needed for Testing
1.Software Requirement
JDK,OS, Browser, MS-office, Web server, Database etc.
2.Hardware Requirement
1.POS Machine
2.Printer
3.RAM
4.Processor
8.Suspend & Resume (Temp Stop of Testing ) Criteria:
1.Show Stopper Defect identified
2.Test Environment not Ready
3.Number of Defect or Type of Defect is more
Where following on testing make no sense its
just waste of Testing
9.Entry Criteria(When To start Testing) & Exit Criteria
1.Source Code/SOftware should 1.All Test Cases should be be Ready executed with 90% Quality
2.Environment should be ready 2.No H.P Defect should be Pending
3.Test Cases should be ready 3.Time & Budget is finished
10.Test Deliverable()
List Documents available During Testing
1.Test Plan
2.Test Scenario
3.Test Cases
4.Test Scripts
5.Execution Log
6.Test Summary Reports
7.Defect Report
11.Schedule:
Deadlines of Activity
Activity Name: Days:
-------------- -----
1.Test Planning 2
2.Test Analysis & Test Design 7
3.Implementation 3
4.Test Execution 2
5.Evaluation Exit Criteria 1
12.Roles & Responsibility
Who is In charge of Which Activity
Activity Name: Name: Designation
-------------- -----
1.Test Planning Mr.John Test Manager
2.Test Analysis & Test Design Mr.Bharat Sr. Qaulity Eng
3.Implementation Mr.Modi Automation Eng
4.Test Execution Mr.Chetan Quality Engineer
5.Evaluation Exit Criteria Mr.Malya Sr. Quality Engineer
13.Staffing & Training
>Hiring New Employee
>Providing Training on Tool & Domain
for New or Old Employee
14.Test Approach(How to do Testing)
1.Automation or Manual Testing
2.Level of Testing
3.Type of Testing > Smoke , Usability, Performance Testing etc.
4.Black or White Box Testing > Black box Testing
15.Risk & Contingency(Project Risk/Process Risk)
> Delay in Training
> Delay in receiving Build
> Manager not having Good Co-ordination Skill
(Plan for Leadership Training)
> Less Time for Testing
(Plan Daily Project Status tracking Process)
> Supplier Issue
> Test Environment Not ready on Time
16.Software Risk Issue:(Product Risk/Quality Risk):
>Delivery of Incomplete Product
>Delivery of faulty Product
>Delivery of Product having security defect
>Govt. policy change
>Hard to use & Slow to respond
17.Approval:
Name Designation Sign Date
Jay K Project Manager 30/02/2070
Test Strategy & Test Approach:
------------------------------
Test Estimation:
--------------------
Roles of Tester & Test Manager
-----------------------------
Configuration Management:
--------------------------
Limitation of Manual Testing:
-----------------------------
1.Time Consuming
2.Repetitive in nature
3.Human Error are introduced in any Manual Testing
4.Inconsistent
5.Less Reliable
6.Less Accurate
7.Testing Like Performance Testing not possible
to be manually
------------------------------------------------------
1000 TC >Test Script
Which Test Cases need to be Automated ?
1.Repetitive & Reusable
1.1 Data Driven Testing:
Repeating same steps with different
set of Data
1.2 Smoke /Sanity
1.3 Multi-platform
Compatibility Testing
2.Testing which is Not possible Manually
1.Performance Testing
2.Complex Security Testing
Tool Categories:
------------------
1.Test Management Tool (STLC): QC(ALM), TestLink, JIRA,Tarantula
>Manages Requirement
>Manages Planning
>Manages Test Case writing
>Manages Defect Reporting(Optional)
2.Defect Management Tool(Defect Life Cycle)
QC(ALM),Bugzilla,Mantis,JIRA
3.Functional Testing Tool
Selenium , QTP(UFT), RFT(Rational Functional Test)-IBM
4.Performance Testing Tool
Jmeter ,LoadRunner, RPT
5.Configuration Management Tool
Git, SVN
------------------
A Process which need to be followed after Defect is Identified.
i.e Attributes of Defect,flow of Defect,Tool to use, Status of
Defect.
Severity Priority
1.Impact of Defect from 1.Impact of Defect from
functionality P.O.V Business/CLient P.O.V.
2.Decided by Quality Engineer 2.Decided by Dev/CLient/Business
Category person
3.Level 3.Level
High High(Immediately,Urgent)
Defect in Basic/Critical Func.
Show stopper
Abnormal Termination
Medium Medium(Before Release)
Functional Defect but
Less Important
Low Low(Can be fixed in next Version)
Font ,Color ,Size
H.S & H.P.
H.S & L.p.
L.S & H.P.
L.S & L.P.
----------------------------------------------------------------------
Defect Flow:
-------------
1.Tester > TTL > DTL > DEV > Tester (Mostly in MNC)
2.Tester > DTL/TTL > DEV > Tester (Middle Scale Company )
3.Tester > DEV > Tester (Low Scale Company)
Defect Life Cycle:
-------------------
Test Planning :
---------------
A Process of Describing Strategy/ Approach of Testing is Called
As Test Planning & Test Plan Document is Produced
Why to do Test Planning ?
--------------------------
1.Better Management
2.Full utilization of Resources
3.Risk Management
4.to do effective Testing( Testing with Good Outcome)
When To Start Test Planing:
---------------------------
1.Requirement Document should be base line
2.Development Plan should be Baseline
IEEE 829 :
1.Test Plan ID:
LMS_MTP_01 > MTP:Master Test Plan | STP:System Test Plan
A Company Level Unique ID for Test PLan
2.References :
1.SRS/BRS
2.Development Plan
3.Previous version of Same Product(optional)
4.Similar Project(optional)
5.IEEE Research Paper (optional)
3.Introduction:
4-5 lines about your Project
4.Feature to be Tested :(What to test ?)
Admin:
> Add/Edit /Delete Books
> Add/Edit /Delete User
> Fine Calculate
> Search for Books/User
> Manage Profile
Librarian:
> Add/Edit /Delete Students
> Issue Book
> Return Book
> Fine Collection
> Search for Book
> Manage Profile
Student:
> Issue Book
> Return Book
> Pay Fine
> Search Book
> Request for Book
----------------------------------------------------------------------
5.Feature Not to be Test ed:(What not to Test : Out of the Scope)
1.Online Fine Payment( Will be Devlop in Next Version )
6.Test Items:
Listing all Modules
1.Admin
2.Librarian
3.Students
7.Test Environment/ Test Bed/ Test Lab:
Hardware & Software Configuration needed for Testing
1.Software Requirement
JDK,OS, Browser, MS-office, Web server, Database etc.
2.Hardware Requirement
1.POS Machine
2.Printer
3.RAM
4.Processor
8.Suspend & Resume (Temp Stop of Testing ) Criteria:
1.Show Stopper Defect identified
2.Test Environment not Ready
3.Number of Defect or Type of Defect is more
Where following on testing make no sense its
just waste of Testing
9.Entry Criteria(When To start Testing) & Exit Criteria
1.Source Code/SOftware should 1.All Test Cases should be be Ready executed with 90% Quality
2.Environment should be ready 2.No H.P Defect should be Pending
3.Test Cases should be ready 3.Time & Budget is finished
10.Test Deliverable()
List Documents available During Testing
1.Test Plan
2.Test Scenario
3.Test Cases
4.Test Scripts
5.Execution Log
6.Test Summary Reports
7.Defect Report
11.Schedule:
Deadlines of Activity
Activity Name: Days:
-------------- -----
1.Test Planning 2
2.Test Analysis & Test Design 7
3.Implementation 3
4.Test Execution 2
5.Evaluation Exit Criteria 1
12.Roles & Responsibility
Who is In charge of Which Activity
Activity Name: Name: Designation
-------------- -----
1.Test Planning Mr.John Test Manager
2.Test Analysis & Test Design Mr.Bharat Sr. Qaulity Eng
3.Implementation Mr.Modi Automation Eng
4.Test Execution Mr.Chetan Quality Engineer
5.Evaluation Exit Criteria Mr.Malya Sr. Quality Engineer
13.Staffing & Training
>Hiring New Employee
>Providing Training on Tool & Domain
for New or Old Employee
14.Test Approach(How to do Testing)
1.Automation or Manual Testing
2.Level of Testing
3.Type of Testing > Smoke , Usability, Performance Testing etc.
4.Black or White Box Testing > Black box Testing
15.Risk & Contingency(Project Risk/Process Risk)
> Delay in Training
> Delay in receiving Build
> Manager not having Good Co-ordination Skill
(Plan for Leadership Training)
> Less Time for Testing
(Plan Daily Project Status tracking Process)
> Supplier Issue
> Test Environment Not ready on Time
16.Software Risk Issue:(Product Risk/Quality Risk):
>Delivery of Incomplete Product
>Delivery of faulty Product
>Delivery of Product having security defect
>Govt. policy change
>Hard to use & Slow to respond
17.Approval:
Name Designation Sign Date
Jay K Project Manager 30/02/2070
Test Strategy & Test Approach:
------------------------------
Test Estimation:
--------------------
Roles of Tester & Test Manager
-----------------------------
Configuration Management:
--------------------------
Limitation of Manual Testing:
-----------------------------
1.Time Consuming
2.Repetitive in nature
3.Human Error are introduced in any Manual Testing
4.Inconsistent
5.Less Reliable
6.Less Accurate
7.Testing Like Performance Testing not possible
to be manually
------------------------------------------------------
1000 TC >Test Script
Which Test Cases need to be Automated ?
1.Repetitive & Reusable
1.1 Data Driven Testing:
Repeating same steps with different
set of Data
1.2 Smoke /Sanity
1.3 Multi-platform
Compatibility Testing
2.Testing which is Not possible Manually
1.Performance Testing
2.Complex Security Testing
Tool Categories:
------------------
1.Test Management Tool (STLC): QC(ALM), TestLink, JIRA,Tarantula
>Manages Requirement
>Manages Planning
>Manages Test Case writing
>Manages Defect Reporting(Optional)
2.Defect Management Tool(Defect Life Cycle)
QC(ALM),Bugzilla,Mantis,JIRA
3.Functional Testing Tool
Selenium , QTP(UFT), RFT(Rational Functional Test)-IBM
4.Performance Testing Tool
Jmeter ,LoadRunner, RPT
5.Configuration Management Tool
Git, SVN